Control interaction studies
As converters cluster on the grid, their fast controls can interact with each other and with the network in ways no single project sees. We look for those poorly damped or unstable modes and find what drives them.
When you need it.
- Several converter plants or HVDC links connect close together electrically.
- The connection sits on a weak part of the grid, where control margins are thin.
- Equipment from different vendors has to work together, and nobody has checked the mix.
- Unexplained oscillations appeared during commissioning or operation.
How we run it.
- 01
Map
Map the converters, their controls and the network around them.
- 02
Screen
Use impedance methods to find where damping is marginal.
- 03
Reproduce
Recreate suspect modes in EMT to confirm cause and severity.
- 04
Stress
Test grid strength, units in service, settings and dispatch.
- 05
Fix
Recommend setting changes or added damping, and verify them.
What we use and what we test.
Tools
- PSCAD / EMTDCTime domain
- Impedance scan toolsFrequency domain
- Vendor control modelsEach converter
Scenarios we run
- Different numbers of converters in service and dispatch mixes
- A range of grid strengths, topologies and outages
- Vendor control modes and setting groups
- Before and after the fix
What you get.
- ReportInteraction assessment with the modes found and what drives them
- EvidenceImpedance and damping results with confirming EMT waveforms
- FixesRecommended changes and the results that verify them
- MethodAssumptions and model sources, written down
How we check it
Findings are checked with more than one method, impedance screening and time-domain runs, and the conditions that decide the result are stated so the operator can review them.
Related case studies.
Questions engineers ask.
How is this different from a single-plant compliance study?
Do you need every vendor's model?
What mitigations are typical?
Have a study like this coming up?
Related: Consultancy hub · SSO / impedance studies · 40 MW battery case study · HVDC & IBR integration